Layup
Load Values
The loads presented in the tables below are based on both stress and deflection, whichever controls, using the design value listed. Allowable loads controlled by stress are increased 15% for a two month load duration. Allowable loads are controlled by deflection are based on applicable 1/180 or 1/240 span deflection limitations.
These values are to be used for roofs only. Contact Unit Structures for assistance on floor applications.
Pitched
roofs should be designed using the converted loads and the converted spans.
These
values are based on a maximum in-use moisture content of less than 15%. In
environments exceeding 15% moisture content, reduce allowable loads 20%.
No.
1 Grade
PSF @ L/180
|
Span (ft.) |
Simple Span |
Random Layup |
2-Span |
Comb. |
| 6.0 | 73 | 96 | 135 | 104 |
| 6.5 | 58 | 75 | 115 | 82 |
| 7.0 | 46 | 60 | 99 | 65 |
| 7.5 | 38 | 49 | 86 | 54 |
| 8.0 | 31 | 40 | 75 | 44 |
| 8.5 | 33 | 62 | 37 | |
| 9.0 | 52 | 31 | ||
| 9.5 | 45 | |||
| 10.0 | 38 |
No.
1 Grade
PSF @ L/240
|
Span (ft.) |
Simple Span |
Random Layup |
2-Span |
Comb. |
| 6.0 | 55 | 71 | 133 | 78 |
| 6.5 | 43 | 56 | 104 | 62 |
| 7.0 | 34 | 45 | 84 | 49 |
| 7.5 | 37 | 68 | 40 | |
| 8.0 | 30 | 56 | 33 | |
| 8.5 | 47 | |||
| 9.0 | 40 | |||
| 9.5 | 33 |
No.
2 Grade
PSF @ L/180
|
Span (ft.) |
Simple Span |
Random Layup |
2-Span |
Comb. |
| 6.0 | 65 | 84 | 110 | 92 |
| 6.5 | 51 | 67 | 93 | 73 |
| 7.0 | 41 | 54 | 81 | 58 |
| 7.5 | 33 | 43 | 70 | 48 |
| 8.0 | 36 | 62 | 39 | |
| 8.5 | 30 | 55 | 33 | |
| 9.0 | 47 | |||
| 9.5 | 40 | |||
| 10.0 | 34 |
No.
2 Grade
PSF @ L/240
|
Span (ft.) |
Simple Span |
Random Layup |
2-Span |
Comb. |
| 6.0 | 49 | 63 | 110 | 70 |
| 6.5 | 39 | 50 | 92 | 55 |
| 7.0 | 31 | 40 | 74 | 44 |
| 7.5 | 33 | 61 | 35 | |
| 8.0 | 49 | |||
| 8.5 | 41 | |||
| 9.0 | 35 | |||
| 9.5 | 30 |